Has anyone noticed whether the bike path through Anzac Park at Toowong 
near to the works site at Dean St got cleaned up?

I had noticed that there was a lot of mud and debris on the track from 
trucks and equipment going in and out of that holding yard. Problem too, 
was that they just drove over the solar LED lamps and covered a couple 
up. They also put deep wheel tracks adjacent to the edge of the track 
driving in the newly laid bit. It was a bit hard to see if they cracked 
any of the concrete but I would not be surprised. I initially reported 
it to MR as the work seemed to be on their road reserve and I thought it 
was related to the overpass project. They told me it was a contractor 
working for Energex and so I got onto the contractor and told them of 
the mess. They apologised for creating it and said they would have it 
all clean by the end of the day and keep it that way. Unfortunately I 
had to get back down south before I could check it out, but I would like 
to know how clean they got it or if indeed they bothered.